Additional equipment for Centrometal PEL-TEC pellet boiler
Categories:
Pellet boilers CENTROMETAL
Additional equipment includes:
- Pump group with mixer for PEL-TEC 12, 18-36, 48 boilers (mandatory)
- Pump group with mixer for PEL-TEC 69 Lambda boilers (mandatory)
- Pump group with mixer PEL-TEC 96 for Lambda boilers (mandatory)
- Lambda probe with module for PEL-TEC boilers
- Room temperature corrector CSK
- Wireless room temperature corrector CSK Touch
- Expansion module for control of two heating circuits CM2K-P
- WiFi module
- Country of manufacture: Croatia;
- Warranty: 2 years.
Available in stock
Models
Room temperature corrector CSK
Wireless room temperature corrector CSK Touch
%
Pump group with mixer for pellet boilers PEL-TEC 96 LAMBDA
Pump group with mixer for pellet boilers PEL-TEC 69 LAMBDA
LAMBDA probe with module for PEL-TEC pellet boiler
%
WiFi Module for Pel-Tec pellet boilers
Pump group with mixer for pellet boilers PEL-TEC 48
%
Pump group with mixer for pellet boilers PEL-TEC 18-36
%
Pump group with mixer for pellet boilers PEL-TEC 12
%
Expansion module for control of 2 heating circuits CM2K-P
48.00 - 1,005.00 €
Price with VAT
max) ? (count = max) : null)">
No review left